I am trying to run my test on a "slower" pace. Is there a way to insert a delay between each and every step? or do I have to do that manually? It is harder to do when I have a test that is 50 steps, and I want it to run at a slower pace.
1) During Quick Execute you can turn on annotation and then adjust the Execution Delay. This controls how much delay is inserted between each and every step.
2) As part of a test list you can adjust the execution delay in the test list settings. The default for this setting is 0 i.e. no delay.