This is a migrated thread and some comments may be shown as answers.

Slow to load "Test as Step"

6 Answers 68 Views
General Discussions
This is a migrated thread and some comments may be shown as answers.
Seff
Top achievements
Rank 1
Seff asked on 06 Mar 2014, 07:43 AM
Hi,

I am using test studio(2012.2.1527).  And using TFS to store our test files.

Currently we have about 300 tests. But every time very very slow to open list of tests in "Test as Step".

Could you help for this issue?

It seemed a little quicker to load if disconnect with TFS.

Thanks

6 Answers, 1 is accepted

Sort by
0
Seff
Top achievements
Rank 1
answered on 11 Mar 2014, 06:33 AM
help
0
Konstantin Petkov
Telerik team
answered on 11 Mar 2014, 08:26 AM
Hi Seff,

Can you please clarify which operation is slow? Do you mean test lists by clicking on the Test List tab in Test Studio or perhaps you mean opening the "Test as Step" dialog in Test View? It will definitely help if you can attach a screen capture displaying the UI which loads slow.

Regards,
Konstantin Petkov
Telerik
The New Release of Telerik Test Studio Is Here! Download, install,
and send us your feedback!
0
Seff
Top achievements
Rank 1
answered on 11 Mar 2014, 08:52 AM
Hi, Konstantin

Thank you for your reply. Sorry for the confuse.

The operation is to click "Test as Step" button in Test View and then wait for the  dialog list of tests . It will take about 2 minutes+ to get the  Select Test dialog. This is low efficient for maintain tests.

Attachment 1 is clicking the button.
Then need long wait for Attachement 2.

Thanks again.
0
Seff
Top achievements
Rank 1
answered on 11 Mar 2014, 08:59 AM
One more thins is we can not do upgrade of the telerik test studio currently.

For last time we did upgrade of version, we found a bug. So it need more interview of the new verson by the team.

And the Result of Lists in new version is not gathered in one result file(.aiiresult). Which is not convenient for our reporting and reviewing. If export to Word/Excel, some called tests running result of details will be lost.(As far as I know, the excel only have the failed steps number and related exception happened. But it will ignor the called other steps in "Test as Step")

0
Konstantin Petkov
Telerik team
answered on 11 Mar 2014, 09:22 AM
Hello Seff,

I just realized you are experiencing this problem with a product version from 2012.2, this is an year old build. The problem you explain has been resolved with the number of performance improvements several months ago (2013.1) so we have nothing else to suggest besides upgrading. We will definitely help whenever you need assistance with latest version.

Regards,
Konstantin Petkov
Telerik
The New Release of Telerik Test Studio Is Here! Download, install,
and send us your feedback!
0
Seff
Top achievements
Rank 1
answered on 11 Mar 2014, 09:29 AM
Thanks a lot
Tags
General Discussions
Asked by
Seff
Top achievements
Rank 1
Answers by
Seff
Top achievements
Rank 1
Konstantin Petkov
Telerik team
Share this question
or