I watched the video for the new release and I have upgraded. In the video it was mentioned on more than 1 occasion that a Test List can be scheduled for a Performance run. However, I do not see where you set the Test List up for a Performance run, only the normal run. Please point me in the right direction.
Note:
I have made a copy of my Test List, selected Edit List and changed it to Performance, the List Has 161 tests in it and against each test I see a message 'Configure for Performance....'. Do I have to configure each test in the list or will it simply run when I select it for scheduling? I will schedule tonight and see the results in the morning. Thanks
Note:
I have made a copy of my Test List, selected Edit List and changed it to Performance, the List Has 161 tests in it and against each test I see a message 'Configure for Performance....'. Do I have to configure each test in the list or will it simply run when I select it for scheduling? I will schedule tonight and see the results in the morning. Thanks