Performance-Time Calculation Incorrect

2 posts, 0 answers
  1. Madhu
    Madhu avatar
    26 posts
    Member since:
    Dec 2010

    Posted 07 Oct 2011 Link to this post

    Support,

    I'm exploring 'Performance testing' feature comes with R2 release.

    I see tool calculating time differences wrongly. Test log showing correct timings but performance window overview showing incorrect timings.

    Log showing: 40Sec to load
    Performance Overview showing: 639ms to load

    Please see attached screenshot.

    Thanks,
    Madhu.
  2. Anthony
    Admin
    Anthony avatar
    19 posts

    Posted 11 Oct 2011 Link to this post

    Hi Madhu,

    Thanks for the feedback on our new Performance feature. The difference you see in time between these two areas is actually expected:

    •  The time between steps in the Test Log is an absolute time, accounting for the entire Test Studio infrastructure. This includes overhead tasks such as maintenance, reading data, writing into the log itself, etc.
    • The Total Time figure in the Performance Overview is a relative time, which isolates the timed action from that step down to the lowest level. It contains none of the Test Studio overhead time and gives you a more accurate figure that truly represents the time spent between Server and Client.

    I hope this makes things more clear.

    Greetings,
    Anthony
    the Telerik team
    Do you want to have your say when we set our development plans? Do you want to know when a feature you care about is added or when a bug fixed? Explore the Telerik Public Issue Tracking system and vote to affect the priority of the items
Back to Top