Today we have released Service Pack 1 for Q2 2014 of Telerik UI for ASP.NET AJAX. Let me highlight the most important fixes and new features in the controls:

Critical Issues Fixed

RadEditor

  • The "Undo" button is not working when ToolProviderID is set
  • When the "AddComment" property is set to true and the content area contains only text, the unselected content is removed in Internet Explorer 9 and 10.
  • The page scrolls when the user pastes in the RadEditor content area under Chrome and Opera
  • The selected element is lost when a dialog is opened in RibbonBar toolbar mode under IE10 and below.
  • When an image in anchor HTML element is replaced via the Image Manager, the anchor is removed.

RadGrid

  • When the EditMode is set to Batch and the user tries to open a cell/row for edit, a JavaScript error is thrown in IE7 and IE8.

RadButton

  • The single click of RadButton gets disabled permanently if а required field validator error is detected.

RadGauge & RadHtmlChart

  • The controls are not rendered in IE 11 with Document Mode 7 or 8.

RadRating

  • The hovered items of RadRating when Precision=Item remain in hovered state when the cursor leaves the boundaries of the control.

RadRotator

  • The client-side events ClientMouseOver and ClientMouseOut of RadRotator are not working.

RadWindow

  • Closing a RadWindow that has either AutoSize and Animations or AutoSize and DestroyOnClose enabled by registering a script from the server in the content page, causes a JavaScript error.

New Features Added

RadAutoCompleteBox

  • Added a HighlightFirstMatch feature for the RadAutoCompleteBox.
  • Improved performance of the control during initialization.

RadGantt

  • Support for all Skins in the Telerik UI for ASP.NET AJAX suite. Here is how the Telerik skin looks like:

    You can examine the different skins through the skin chooser control placed in the top right corner of the demos.
  • Ability to define custom task properties through inheritance.

RadGrid

  • Improved RadGrid load time in debug mode when there are a lot of hidden columns.

RadToolTip

  • Introduced WCF WebService support for RadToolTipManager.

You can find a detailed list of all fixes and improvements in the Release Notes.

If you want to report a problem or raise the priority of an existing one, do not hesitate to use the Feedback portal.

Get the Trial Version of Telerik UI for ASP.NET AJAX


Rumen-Jekov
About the Author

Rumen Jekov

Rumen Jekov (@Rumen_Jekov) started his career at Telerik’s ASP.NET team in 2004 as a tech support engineer and passed through the position of a team lead to a product manager. He has answered more than 51,500 tickets helping customers to achieve their goals. Presently, he is a product owner of Telerik UI for ASP.NET AJAX and a manager of the AJAX crew at Progress. Off work, he enjoys traveling across the globe, watching movies and tech shows, reading books and listening to podcasts.

Related Posts

Comments

Comments are disabled in preview mode.