This is a migrated thread and some comments may be shown as answers.

[Solved] Stack concurrent appointments in day/week view

3 Answers 107 Views
Scheduler
This is a migrated thread and some comments may be shown as answers.
dsavillian
Top achievements
Rank 1
dsavillian asked on 02 Apr 2009, 10:33 PM
Greetings,

I'm using the scheduler to display many concurrent events and am running into a problem with the week and day views.  By default it displays the concurrent appointments side by side, and if there are more than 2 or 3 at the same time, they divide the horizontal space equally between them and become impossible to read (in week view that is).

Is it possible to stack concurrent appointments vertically (like in the month view) in the week and day views?

Thanks!

3 Answers, 1 is accepted

Sort by
0
Accepted
Atanas Korchev
Telerik team
answered on 03 Apr 2009, 09:51 AM
Hello dsavillian,

Unfortunately this is not possible. Appointments are stacked vertically only in month view.

All the best,
Albert
the Telerik team

Check out Telerik Trainer , the state of the art learning tool for Telerik products.
0
dsavillian
Top achievements
Rank 1
answered on 03 Apr 2009, 03:18 PM
Hmm, that's fair I suppose.  It appears that the timeline view will work instead

Follow up question:

How do I make the "more" link in the month view direct the user to the timeline view instead of the day or week view?

Thanks
0
Kamen Bundev
Telerik team
answered on 06 Apr 2009, 01:32 PM
Hi David,

Check this help article about the NavigationCommand server-side event, though you should check if it is fired from the Month View.

Best wishes,
Kamen Bundev
the Telerik team

Check out Telerik Trainer , the state of the art learning tool for Telerik products.
Tags
Scheduler
Asked by
dsavillian
Top achievements
Rank 1
Answers by
Atanas Korchev
Telerik team
dsavillian
Top achievements
Rank 1
Kamen Bundev
Telerik team
Share this question
or