FastNavigationStep property set to first and last months of the year of the selected date

3 posts, 0 answers
  1. Lovely Olivia
    Lovely Olivia avatar
    2 posts
    Member since:
    Sep 2008

    Posted 16 Sep 2008 Link to this post

    Hi,

    Is it possible to set FastNavigationStep property to the first and last months of the year of the selected date eg: if the selected date is 10/05/2008, clicking left double arrows will show Jan/2008 and clicking right double arrow will show Dec/2008? Can you suggest the best way, if possible, to do this. Thank you very much.


    Lovely Base
  2. Maria Ilieva
    Admin
    Maria Ilieva avatar
    4017 posts

    Posted 16 Sep 2008 Link to this post

    Hello Olivia,

     Currently the required functionality could not be acheived with the RadCalendar control. The FastNavigationStep is a property which could take only one parameter which is valid for the both directions.

    Regards,
    Maria Ilieva
    the Telerik team

    Check out Telerik Trainer, the state of the art learning tool for Telerik products.
  3. Lovely Olivia
    Lovely Olivia avatar
    2 posts
    Member since:
    Sep 2008

    Posted 17 Sep 2008 Link to this post

    Hi Maria,


    Thank you for your reply.



    Lovely Base
Back to Top