Hi
Not sure if there is any help you can give me but here goes.
I have a scheduler which loads a number of different resources with different appointments on each resources. There can be up to 20 resources loading in the scheduler but not always. Sometimes only 4.
For a number of our clients the scheduler takes a while to load. Upto 30 seconds sometimes. Is there anyway we can speed this loading up? Some way of deferring the load of scripts or something?
Any ideas would be great
Thanks
Jon
Not sure if there is any help you can give me but here goes.
I have a scheduler which loads a number of different resources with different appointments on each resources. There can be up to 20 resources loading in the scheduler but not always. Sometimes only 4.
For a number of our clients the scheduler takes a while to load. Upto 30 seconds sometimes. Is there anyway we can speed this loading up? Some way of deferring the load of scripts or something?
Any ideas would be great
Thanks
Jon