Hi
I was just wondering if it is possible to somehow handle events from the datepicker that is embedded into scheduler in month view?
Basically, what I'm trying to do is capture the date that was selected, and then redirect based on that date, eg. If 18 July 2009 is picked, redirect to Calendar.aspx?date=20090718
I was just wondering if it is possible to somehow handle events from the datepicker that is embedded into scheduler in month view?
Basically, what I'm trying to do is capture the date that was selected, and then redirect based on that date, eg. If 18 July 2009 is picked, redirect to Calendar.aspx?date=20090718