Telerik blogs

Latest

  • Productivity

    Telerik OpenAccess ORM – ASP.NET Web Forms Video Tutorials

    Besides the currently trending MVC framework, the traditional Web Forms are widely used for web applications development, so probably many of you are already familiar with them. OpenAccess ORM is an excellent choice for your Data Access Layer in such situation, as it is easy to integrate in just a few steps. We have already explained those steps in our new ASP.NET Development Guide, but we figured a visual representation of the same will be a faster and more pleasant way of learning what you need to know.   We have created two separate videos: for developing a Web Site using a Model First approach...
    May 27, 2021 1 min read
  • Productivity Reporting

    Reset PageNumber per Report Group

    Download Telerik_Reporting_Reset_PageNumber_per_Group (C#) - 4.72 KB In Telerik Reporting, the PageNumber object can only be used in the page header and page footer sections. It contains the current page number and its value is increased with one for every new page. In some scenarios, it is useful to alter the page number based on a condition and the most frequent scenario being asked is resetting the PageNumber after each group. The powerful expression engine of Telerik Reporting allows you to accomplish this easily with the help of page aggregates and tiny bit of code. Basically the idea is to check what is the last group on a page and if it...
    May 27, 2021 2 min read
  • Productivity

    Telerik OpenAccess ORM – MVC Video Tutorials

    We believe that the fastest way to learn how to use an OpenAccess model in your ASP.NET MVC 3 application is to watch a video tutorial. Therefore we have prepared some videos, guiding your OpenAccess ORM integration in an MVC project step by step.   Of course, there are different approaches to that based on your needs and personal preferences – you might want to use the strong capabilities of our Visual Designer Database-First scenario to create your Domain Model or you can map everything using our Fluent Mapping API. In any case, each of the dedicated video series will guide you through the...
    May 27, 2021 1 min read
  • Productivity

    Scope, Schedule, and Resources – You can’t have them all

    Imagine the scene.  You are starting a new project.  At the kickoff meeting the stakeholder introduces the mission of the project, the business analyst hands out the requirements document, the project manager hands out the project plan, and the development manager gives his best “Do it for the Gipper” speech.  You look through the project plan and see that it specifies a release date (several months in the future), the resources that will be involved, major milestones to be met, and everyone’s assignments. The team looks over the stack of paper in front of them, and roll their eyes. “Here we...
    May 27, 2021 6 min read
  • Productivity

    Scope, Schedule, and Resources – You can’t have them all

    Imagine the scene.  You are starting a new project.  At the kickoff meeting the stakeholder introduces the mission of the project, the business analyst hands out the requirements document, the project manager hands out the project plan, and the development manager gives his best “Do it for the Gipper” speech.  You look through the project plan and see that it specifies a release date (several months in the future), the resources that will be involved, major milestones to be met, and everyone’s assignments. The team looks over the stack of paper in front of them, and roll their eyes. “Here ...
    May 27, 2021 6 min read