Hi,
I have been given a project which has a lot of reports in Q2 2009 .cs file format. I am not sure if it is even the correct format but the reports work well with the Q2 2009 designer in VS 2010.
When I tried to upgrade to Q1 2012 it only upgrades some .resx files and the .cs files no longer work, they can't be edited. Is there a special procedure I should follow? Any tips?
Thank you.
I have been given a project which has a lot of reports in Q2 2009 .cs file format. I am not sure if it is even the correct format but the reports work well with the Q2 2009 designer in VS 2010.
When I tried to upgrade to Q1 2012 it only upgrades some .resx files and the .cs files no longer work, they can't be edited. Is there a special procedure I should follow? Any tips?
Thank you.