This is a migrated thread and some comments may be shown as answers.

TimeLineView with resources appointment rowwise

2 Answers 51 Views
Scheduler
This is a migrated thread and some comments may be shown as answers.
Vijay
Top achievements
Rank 1
Vijay asked on 13 Feb 2009, 04:33 AM
Hi,

I am building a control in a timeline view. I want to have my resources listed on the left most column one below the other. For any assignments to these resources, should be displayed on the right of it. A assignment would be displayed as a horizontal bar for the resource assigned.
How is this possible in RadScheduler control?
If it is not possible with RadScheduler control then only option for me is to have a resource column display dynamically and for each resource dymamically create a RadScheduler control and give assignments to it. I know this is a very costly affair from performance point of view but I have no other go!!!

2 Answers, 1 is accepted

Sort by
0
Peter
Telerik team
answered on 13 Feb 2009, 04:37 PM
Hello Vijay,

If I understand you correctly, then you can get this behavior simply configuring the Timeline view with GroupingDirection= vertical. Please, see this exampel for reference:
http://demos.telerik.com/aspnet-ajax/scheduler/examples/timelineview/defaultcs.aspx

Best wishes,
Peter
the Telerik team

Instantly find answers to your questions on the new Telerik Support Portal.
Check out the tips for optimizing your support resource searches.
0
Vijay
Top achievements
Rank 1
answered on 18 Feb 2009, 05:29 AM
Thanks a lot Peter. The link you sent was helpful.

Regards,
Vijay
Tags
Scheduler
Asked by
Vijay
Top achievements
Rank 1
Answers by
Peter
Telerik team
Vijay
Top achievements
Rank 1
Share this question
or