I have attached a sample layout of a scheduler that i want to show the status change line and summary based on a SQL database table.
On the top is the timeline for one day.
left side are 4 status.
right side shows the summary for each status of on day.
The status change line is in the center of this chart.
If Telerik scheduler can do it , or other controller which may able to do it?
Thanks,
Steve