How to draw status change line and summary

1 posts, 0 answers
  1. Steve
    Steve avatar
    1 posts
    Member since:
    Jun 2017

    Posted 06 Jul 2017 Link to this post

    I have attached a sample layout of a scheduler that i want to show the status change line and summary based on a SQL database table.

    On the top is the timeline for one day.

    left side are 4 status.

    right side shows the summary for each status of on day.

    The status change line is in  the center of this chart.

     

    If Telerik scheduler can do it , or other controller which may able to do it?

     

    Thanks,

    Steve