I'm trying to create a timeline of meeting schedules based on grouping buildings, floors and room. I was able to group floors and rooms but how can i include building into the picture as seen in the attached image.
1 Answer, 1 is accepted
0
Vladimir Iliev
Telerik team
answered on 22 Sep 2015, 10:05 AM
Hello Alex,
The desired behavior is not supported out of the box and custom solution would be required. For example you can create custom view by extending one of the build-in ones or initialize several schedulers where each one would contain only single group on top level ("Building"). Please check the related resources below: