if we move a cell down with keyboard and we reach a cell greater then max then scheduler block .
3 Answers, 1 is accepted
0
Ivan Danchev
Telerik team
answered on 06 Jul 2017, 01:47 PM
Hello Baba,
As far as I can see the Scheduler's behavior is expected when configured as in your screenshot. See this dojo example and this short screencast. As explained in the documentation the max option sets the maximum date that you can navigate to using the Scheduler's navigation, so for example if you have January 1, 2014 selected you will not be able to navigate with the "forward" button to January 2 or select it from the DatePicker. You are allowed to navigate to previous dates, but not to dates after the date set to the max option. Still you can navigate to a date after January 1 manually, by selecting a slot in the Month view and then switching to Day view.
The problem is in month view: when i move manually (from the keyboard) the selection over the maximum date (to go into another cell/day) the all window block and i can do anything ,and there is no error.. so it is a kendo bug this? Or is a way to prevent this?
0
Ivan Danchev
Telerik team
answered on 10 Jul 2017, 03:01 PM
Hello Baba,
Thank you for the additional information provided. We were able to reproduce the described behavior and logged it for fixing. You can track it on our Github repo here. As of now we don't have a workaround but if we manage to come up with one we will post it in the linked issue.
I updated your Telerik points for reporting this bug.