This is a migrated thread and some comments may be shown as answers.

How to work with UTC time?

1 Answer 126 Views
Gantt
This is a migrated thread and some comments may be shown as answers.
Igor
Top achievements
Rank 1
Igor asked on 17 Mar 2015, 10:25 AM
Good afternoon.

How to work with UTC time?

Now I have the following problem from the server response "2014-11-26T18: 52: 48", after the change in the Diagram, is sent to the server in the format "2014-11-26T18: 52: 48Z" and In diagram displays + 2 hours in change the task.

Thank you for your help.

1 Answer, 1 is accepted

Sort by
0
Igor
Top achievements
Rank 1
answered on 18 Mar 2015, 03:40 PM
I realized my mistake, not the right time format. 

the server should return in the format "2014-11-28T14:00:00+02:00", then everything is working correctly