This is a migrated thread and some comments may be shown as answers.

[Solved] Drag&Drop: Change Order In Same Hierarchy Level

3 Answers 153 Views
TreeView
This is a migrated thread and some comments may be shown as answers.
Tim Tos
Top achievements
Rank 1
Tim Tos asked on 28 Apr 2011, 12:53 PM
Hello.

I have a treeview like this:
A
    A1
    A2
    A3
B
    B1
    ...

Now I want to drag A2 before A1 but unfortunately I am not able to use drag & drop inside the same hierarchy level?!?!?
I always get that little red sign indicating that it is not allowed to drop something at this location. On the other hand I am able to drag B1 below A. I don't want this but that's a different story... :)  If I understood it right it should be possible by default to move all the elements around as one like to... Has anyone experienced the same problem? How can that happen? I am using the latest version of the RadTreeView.

Any help?
Thanks a lot!!!
Tim.

3 Answers, 1 is accepted

Sort by
0
Tim Tos
Top achievements
Rank 1
answered on 28 Apr 2011, 02:18 PM
I think I got the problem identified: ElementHost!
I've created a little solution with a library containing the TreeView, a WPF app using this library and a WinForm app using this library.
Within the WPF app I can drag and drop as it is expected but in the WinForms app I get the described problem...

Any workaround? Is it not possible to use drag and drop within an ElementHost?
Any help appreciated!
Thanks, Tim.
0
Tina Stancheva
Telerik team
answered on 03 May 2011, 06:17 PM
Hello Tim Tos,

This is a known issue in the RadTreeView control in this scenario. It is logged in our PITS where you can track its progress and vote for it thus increasing its priority.

Unfortunately I am not aware of any workarounds at the moment. I hope this is not a showstopper for you.

All the best,
Tina Stancheva
the Telerik team
Do you want to have your say when we set our development plans? Do you want to know when a feature you care about is added or when a bug fixed? Explore the Telerik Public Issue Tracking system and vote to affect the priority of the items
0
Tim Tos
Top achievements
Rank 1
answered on 09 May 2011, 11:12 AM
Hello Tina,

thanks for your reply! Tracking and voting done! :)
All the best,
Tim.
Tags
TreeView
Asked by
Tim Tos
Top achievements
Rank 1
Answers by
Tim Tos
Top achievements
Rank 1
Tina Stancheva
Telerik team
Share this question
or