Hi,
When I have a chart displayed like so : http://take.ms/ms8e1
The space on the right is not available for me to drag a task into if I want to, for example I cannot drag and drop one of the tasks to start on 1/10 in the screnshot without first having a task that exists on that timeline, thus expanding the chart area.
Is it possible to extend the draggable area out several units past the last existing end date ?