I have three sets of data with a date on the x-axis.
The three sets to cross and cover correctly, but the dates at the bottom are off
On the far right the datapoints are for 8/28 but are "over" 8/21, the 8/17 dates in the middle are over 8/13.
Is there any way to sync this up better?