# TFS Project Item Options

<a href="http://www.telerik.com/teststudio" target="_blank">Test Studio</a> provides built-in integration with TFS source control.

In order to maintain the source controlled project, there are 5 Source Control specific options when you right click on a project item, which is connected to TFS, and hover over **Source Control**.

![Source Control](https://www.telerik.com/teststudio/documentation/assets/47e643c390bd615f085e0a65f872ece0/fig1.png)

* **Check In to Source Control** - check-in the selected project item.
* **Check Out from Source Control** - check-out the selected project item.
* **Get Latest** - obtain the current copy of the selected project item from Source Control.
* **Revert to Server Version** - undo changes made to the selected project item since check-out. If applied to Settings.aiis file the project will be reloaded.
* **Disconnect from Source Control** - disconnects the selected item from Source Control.