2 posts, 0 answers
  1. Vasiliy
    Vasiliy avatar
    2 posts
    Member since:
    Aug 2011

    Posted 10 Aug 2011 Link to this post

    - localizable UI ( an russian one for my company )
    - a possibility to move tasks from one story to another ( The use case is the following - we starting estimation of some story and then realizing that story is quite big for an one interation. So we split it into two or more stories and then we want to split tasks between them. Atm i need delete tasks from one story and then recreate them into another. So it would be nice if i have a possibility just drag-n-drop them to another story )
     - there are 2 levels of estimates: story and tasks. Moreover Team Pulse uses an estimates of stories to calculate an load of iteration. But i want to use an estimate on story level just as an value of complexity for the future planing and a sum of estimates of tasks as an actual load of iteration.
  2. Ryan
    Admin
    Ryan avatar
    164 posts

    Posted 10 Aug 2011 Link to this post

    Hello Vasiliy,

    1. In the R2 release due out in the next couple weeks we have added better Globalization support for non-English characters. Localizing the UI will not be in this release but we are looking at it for future versions.

    2. Moving tasks from one story to another is not something we specifically have in our backlog, but the use case you mention is. The ability to split stories is a feature we would like to add and I have included your note about moving tasks when splitting.

    3. We have a story in our backlog for improving estimation roll-ups. I have added your note about iteration capacity to this story.

    Thanks for all the great feedback!

    Ryan
    the Telerik team