Hi,
I upgraded my project from 2012.2.607 til 2012.3.1129 using the upgrade Wizard in Visual studio. Without doing anything to my code whatsoever, my stacked barchart is no longer plotted correctly. It looks like "stack2" is plotted on top of "stack1" but still placed next to it and where the gap down to zero for "stack2" is just filled in. All 4 series have point values 1, 2, 3 and 4, and series 1 and 2 should be stacked and series 3 and 4 stacked.
I have tried to upgrade with the latest hotFix, but no change.
Attached is a picture where the first chart is the correct one.
I upgraded my project from 2012.2.607 til 2012.3.1129 using the upgrade Wizard in Visual studio. Without doing anything to my code whatsoever, my stacked barchart is no longer plotted correctly. It looks like "stack2" is plotted on top of "stack1" but still placed next to it and where the gap down to zero for "stack2" is just filled in. All 4 series have point values 1, 2, 3 and 4, and series 1 and 2 should be stacked and series 3 and 4 stacked.
I have tried to upgrade with the latest hotFix, but no change.
Attached is a picture where the first chart is the correct one.