Reusability of Tests

3 posts, 0 answers
  1. John
    John avatar
    13 posts
    Member since:
    Apr 2012

    Posted 04 Apr 2012 Link to this post

    Hi All,

    In VS if I have 2 projects which contains multiple tests then is it possible to use Test as Step from other project?
    Means for example I have projectA & PeojectB in VS.In ProjectA I am writing a new test case for which I want to use test case from ProjectB as a step, is this possible, if yes how?
  2. Cody
    Admin
    Cody avatar
    3360 posts

    Posted 06 Apr 2012 Link to this post

    Hello John,

    No I am sorry it is not possible to use a test from a different project with our Test-as-step feature. The technical problem is that Test Studio assumes any coded steps for that subtest will use the same DLL that the parent test is using. Since the test is contained in a different project it must use a different DLL, and Test Studio is incapable of locating that matching DLL.

    As a result we simply do not allow this in our UI.

    All the best,
    Cody
    the Telerik team
    Quickly become an expert in Test Studio, check out our new training sessions!
    Test Studio Trainings
  3. John
    John avatar
    13 posts
    Member since:
    Apr 2012

    Posted 09 Apr 2012 Link to this post

    Thanx Cody for the reply.