RadGrid Bound to Selected Task

2 posts, 0 answers
  1. John
    John avatar
    3 posts
    Member since:
    Feb 2014

    Posted 15 Apr 2015 Link to this post

    Is there any way to bind a RadGrid to the ID of the selected task and refresh when the selected task changes? 

    We have additional fields that we want to add to the resources and collect other information tied to the task that would be easier to do in a RadGrid outside of the control.   (Also want to maintain the selected task when refreshing the other grids.)

  2. Dimitar Terziev
    Dimitar Terziev avatar
    1266 posts

    Posted 17 Apr 2015 Link to this post


    Attached is a sample page showing how to handle task selection in the RadGantt.

    Dimitar Terziev
  3. DevCraft R3 2016 release webinar banner
Back to Top