    Hi,

    Just wondering if there is a way to specify the sequence of the shapes in the diagram when I add shapes to the diagram via datasource and connectionSource.

    the example 1 is

    http://dojo.telerik.com/aQUPE

    I am trying to get the s1 above the s2 and s2 above s3, but the result is s3 above s2 and s2 above s1.

     

    the example 2 is 

    http://dojo.telerik.com/EfUPu

    I am still trying to add s1 above s2 and s2 above s3. In the next level , I am trying to have s4 above s5

    Please could  you let me how specify the order of the space in the diagram if it can be done? I am using layout - layered and right.

    If not, could you let me know the logic of setting up the shapes' positions behide the diagram

     

     

     