Drag&Drop: Change Order In Same Hierarchy Level

4 posts, 0 answers
  1. Tim Tos
    Tim Tos avatar
    36 posts
    Member since:
    Apr 2010

    Posted 28 Apr 2011 Link to this post

    Hello.

    I have a treeview like this:
    A
        A1
        A2
        A3
    B
        B1
        ...

    Now I want to drag A2 before A1 but unfortunately I am not able to use drag & drop inside the same hierarchy level?!?!?
    I always get that little red sign indicating that it is not allowed to drop something at this location. On the other hand I am able to drag B1 below A. I don't want this but that's a different story... :)  If I understood it right it should be possible by default to move all the elements around as one like to... Has anyone experienced the same problem? How can that happen? I am using the latest version of the RadTreeView.

    Any help?
    Thanks a lot!!!
    Tim.
  2. Tim Tos
    Tim Tos avatar
    36 posts
    Member since:
    Apr 2010

    Posted 28 Apr 2011 Link to this post

    I think I got the problem identified: ElementHost!
    I've created a little solution with a library containing the TreeView, a WPF app using this library and a WinForm app using this library.
    Within the WPF app I can drag and drop as it is expected but in the WinForms app I get the described problem...

    Any workaround? Is it not possible to use drag and drop within an ElementHost?
    Any help appreciated!
    Thanks, Tim.
  3. Tina Stancheva
    Admin
    Tina Stancheva avatar
    3300 posts

    Posted 03 May 2011 Link to this post

    Hello Tim Tos,

    This is a known issue in the RadTreeView control in this scenario. It is logged in our PITS where you can track its progress and vote for it thus increasing its priority.

    Unfortunately I am not aware of any workarounds at the moment. I hope this is not a showstopper for you.

    All the best,
    Tina Stancheva
    the Telerik team
    Do you want to have your say when we set our development plans? Do you want to know when a feature you care about is added or when a bug fixed? Explore the Telerik Public Issue Tracking system and vote to affect the priority of the items
  4. Tim Tos
    Tim Tos avatar
    36 posts
    Member since:
    Apr 2010

    Posted 09 May 2011 Link to this post

    Hello Tina,

    thanks for your reply! Tracking and voting done! :)
    All the best,
    Tim.
Back to Top