Code generation for property "Text" failed

4 posts, 0 answers
  1. Jyotiranjan Sahoo
    Jyotiranjan Sahoo avatar
    6 posts
    Member since:
    Mar 2010

    Posted 07 Nov 2012 Link to this post

    Hi,

     

    We are using Telerik Reporting Q2 2010 v4_1_10_921_dev for our project reports. we are working on localizing Reports.

     

    we started by using "localizing Telerik Reports video" as reference.

    http://tv.telerik.com/watch/reporting/localize/localizing-telerik-reports

     

    As mentioned in video, when we enter the french text in the Text block and hit enter french resource file will be generated automatically. But when we try enter text and hit enter its giving error
    "Code generation for property "Text" failed". Refer attached screen shot.

     

    Steps we followed :

     

    Set the report localize property to true

    Set the language property to french

    Replace the text with french text and hit enter ( as mentioned in video) and error pops up.

     

    Request you assist in solving problem.

    Thanks and Regards
    Jyoti

  2. Steve
    Admin
    Steve avatar
    10941 posts

    Posted 08 Nov 2012 Link to this post

    Hello Jyoti,

    We have never seen or been reported with such an error. We tested the localization of the report with the latest official Q3 2012 version and did not encounter any problems.
    Please also note that version 4.1.10.921 is more than two years old and even if this is a problem specific to this version (which we could not confirm), fixes will not be applied to it. That is why we highly recommend upgrading your reports to a more recent version.

    Regards,
    Steve
    the Telerik team

    HAPPY WITH TELERIK REPORTING? Do you feel that it is fantastic? Or easy to use? Or better than Crystal Reports? Tell the world, and help fellow developers! Write a short review about Telerik Reporting and Telerik Report Designer in Visual Studio Gallery today!

  3. DevCraft banner
  4. Jyotiranjan Sahoo
    Jyotiranjan Sahoo avatar
    6 posts
    Member since:
    Mar 2010

    Posted 08 Nov 2012 Link to this post

    Hi,

    Does latest Reports version are backward compatible or any fields and methods are made obsolete.

    How easy it will be to upgrade to latest versions.

    Appreciate your quick response.

    Thanks and Regards
    Jyoti
  5. Steve
    Admin
    Steve avatar
    10941 posts

    Posted 09 Nov 2012 Link to this post

    Hi Jyoti,

    I've attached a sample project using v.4.1.10.921 that has localized report working properly. Please review it carefully and compare the differences between this project and yours.

    About upgrading - there have been numerous changes since Q2 2010 and these changes are reflected in the product Release History. The upgrade of the references itself is a breeze as it is handled by the Upgrade Wizard, but any API changes have to be altered manually, so in short your reports would require changes before they can be run with the latest version.

    All the best,
    Steve
    the Telerik team

    HAPPY WITH TELERIK REPORTING? Do you feel that it is fantastic? Or easy to use? Or better than Crystal Reports? Tell the world, and help fellow developers! Write a short review about Telerik Reporting and Telerik Report Designer in Visual Studio Gallery today!

Back to Top