Hello David,
There is currenlty no option in the UI to choose the type of link to use for the parent/child task board view. We had a pretty tight schedule in our latest round of development and unfortunately this feature didn't make the cut. However, what you can do is edit the task board settings manually to change the type of link used. Here are the steps:
- Open the task board settings file in a text editor ({My Documents}\Work Item Manager 2010\{Server}\{Collection}\{Project}\TaskBoardSettings.xml).
- Find the LinkTypeName element and change System.LinkTypes.Hierarchy-Forward to Scrum.ImplementedBy-Forward.
- Save the text file.
If you are sharing your task board settings across your team, you will also need to make sure that this manual change get saved to the TFS server. This can be done by simply opening the Task Board Settings screen in WIM, changing something, and clicking OK.
If you're not sure if you're using shared settings, go to
Application Button >
Options and check if the
Use Server Setttings checkbox beside your project is checked.
Regards,
Joel
the Telerik team