Posted
on Dec 14, 2011
(permalink)
I too would like to add to the comments above about "Ability to have more than one task board"
The tak link feature is perfect for what I want to achieve except for one thing.
I have three levels of work items with parent child releationships.
Projects
MMF's
Tasks
Each has it's own process within tfs with its own states.
Project (Backlog, Initiation, In Prgress, Done)
MMF (Backlog, To Do, Test Preparation, Dev, Test, Release, Done)
Task (To Do, In Progress, Review, Done)
The taskboard only has one set of columns that need to encompas all of the states available for all work items that can be displayed. What would prevent a change to allow these to be configured for each work item type?