Posted
on Jan 8, 2010
(permalink)
Thanks for the cool tool, very useful.
I meet a problem and need your help.
In current Project DashBoard (beta), after specifying the Team Project, is the user able to set the iteration, area path condition, etc to filter unwanted data out of the dashboard?
After all, the user could have very huge project that contains a lot of iterations and areas.